A 40-foot PermaTrak bridge connects visitors to a nearby residential area, and across the park, a 50-foot bridge goes through an oak forest. Park visitors can traverse the 1.25-mile Waughtown Connector Greenway, which connects the Quarry Park trail with existing Winston-Salem greenways.
The park’s main architectural feature, a unique cantilever truss that extends 100 feet over the quarry, serves as an observation deck and offers beautiful views of the city skyline.
The project was funded using $5 million in public bonds, which were voted on via referendum by Winston-Salem residents.
The quarry, which had previously become a dumping ground for Christmas trees and other yard debris, had fallen into disrepair. After more than 15 years as an “organic landfill”, the City saw an opportunity to create a space that visitors can use for recreation and special events, all while honoring the history of the area.
In the late 1990s and early 2000s, the City began to use the property as a place for residents to drop off yard waste and other organic materials. The material would be converted into mulch, which was free for residents to pick up and reuse. In 2012, the City began to look at other possibilities in the area, and in 2016, bonds were approved to improve other parks in the City and make Quarry Park a reality.
Residents no longer have access to the lake for fishing, swimming, or boating, but the park offers plenty of other activities for visitors. In addition to the greenways and observation deck, the park features picnic tables, several scenic overlooks, and an amphitheater that will be used for future events and performances.
The park has been a popular spot for residents of and visitors to Winston-Salem, and the City has already begun discussing plans for Phase 2.
The City wanted to find an easy-to-install solution that was maintenance-free, yet durable and strong enough to hold any emergency vehicles that may need to use the trail to get to users. They also wanted to honor the history of the area with an industrial look.
Kimberly Barb, a Landscape Architect with Winston-Salem-based Stimmel Associates, immediately knew the solution she wanted to use, and introduced the City to PermaTrak. She explains, “Having worked with Jason [Philbin] in the past, we thought PermaTrak would be a great fit for this project. The City agreed, and in fact, they liked it so much for Quarry Park that they used PermaTrak for another project. The bridges functioned exactly as they needed to, and was easy to install.”
Installation for the 10-foot wide bridges took roughly one day each and went very smoothly. To enhance the industrial look, the bridges’ railing systems were built using galvanized steel and cable strands.
Future expansion and development for the park is sure to continue this commitment to honoring the past while celebrating the current growth of the area.
Photo Credit: 1st photo and photo gallery below: Stimmel Associates; 2nd photo in article: Winston-Salem Journal (Jim Keith)