
The existing weathered, warped and discolored timber boardwalk sprawling alongside Lake Keowee was in dire need of an update. With durability being the highest priority, Keowee Key managers ultimately selected PermaTrak as the best solution for the waterfront community.
Keowee Key residents can now enjoy the long-lasting 8 ft. wide, 374 ft. long PermaTrak concrete boardwalk shown in the photos below. Click here to learn more about the Keowee Key project.
A concrete boardwalk over sensitive tree roots in downtown Charleston, the walkway provides a 5' clearance for pedestrians and cyclists.