
A 276-foot concrete boardwalk that meanders along a creekline uses micropiles to minimize disturbance to a gradient bank and existing trees. The project also includes an overlook area and separate 12-foot crossing.
Two 12 ft. wide PermaTrak boardwalk sections are included in the newly completed ¾ mile long extension of the existing Clabber Creek Trail. The extension provides greater connectivity for the city’s cyclists, runners, and walkers. To read more about the Clabber Creek project, click here.