Quick Access Installation Videos
Traditional Construction
Traditional construction is our most common method and often the most cost-effective approach.
- When to use: Most projects where site access allows
- Equipment: Varies based on foundations. Often standard cranes, excavators, or skid steers
- Timeline: Typical installation time varies; however the boardwalk above was completed in just 10 days!
- Cost impact: Generally the most economical installation method
Top-Down Construction
Required for wetland projects, restricted access sites, or when environmental permits mandate installation from above.
- When required: Wetlands, dense forests, or permit restrictions
- How it works: Equipment operates on already-installed boardwalk sections
- Three methods available: Helical piers, vibrated piles, or ground-based foundations
- Planning note: Requires coordination between equipment size and boardwalk structural capacity
See our detailed guide on top-down construction and building through wetlands here.
What You Can Expect
PermaTrak provides comprehensive support to ensure your installation goes smoothly.
- Construction kick-off meeting with your superintendent and install team
- CAD foundation drawings sent directly to your team
- Installation guide review including tips from 15+ years of installations
- Equipment recommendations based on your specific project requirements
On-Site Support
A PermaTrak Technical Field Support specialist will meet with your crew at project start to:
- Review the installation plan and drawings
- Help with initial beam and tread placement
- Ensure you have the right equipment and approach
- Answer questions about site-specific challenges
Ongoing Consultation
Questions come up during any installation. Our technical team remains available throughout your project for:
- Problem-solving (like foundation discrepancies)
- Equipment guidance
- Installation sequence optimization
- Quality assurance support
Installation Basics
|
Needed for Installation |
What PermaTrak Provides | What You Provide |
|---|---|---|
| Reinforced precast concrete beams | ✔ | |
| Reinforced precast concrete treads | ✔ | |
| Rubber bearing pads | ✔ | |
| Foundation installation per engineering drawings | ✔ | |
| Lifting equipment (crane, excavator, etc) | ✔ | |
| Site preparation & access | ✔ | |
| Labor for installation | ✔ |
Other Resources for Installers:
Download our Installation Guide
Our new boardwalk installation guide now includes visual aids and clear, step-by-step instructions for each project phase.
Includes:
- Handling treads, beams & abutments
- Setting precast foundations
- Setting Abutment on Grade
- Setting Abutment on Helical Pier
- And more!