See how simple and fast PermaTrak concrete boardwalk installation can be! Our Matthews Glen Phase 2 boardwalk in Matthews, NC was completed in just 10 days.
Key Timestamps:
- 0:12 — Drilling Pilot Holes for Piles
- 0:26 — Lowering Timber Piles Into Pre-drilled Holes
- 0:34 — Filling Pile Holes With Concrete
- 0:43 — Unloading PermaTrak Treads
- 0:54 — Unloading PermaTrak Beams
- 1:05 — Tightening Pile Caps & Checking Pile Cap Elevation
- 1:20 — Setting PermaTrak Beams
- 1:53 — Drilling Beam Connection Holes & Filling With Epoxy
- 2:02 — Unloading & Setting PermaTrak Treads
- 2:43 — Rolling out Rubber Bearing Pad
- 2:50 — Placing Spacer Pad on Treads
- 2:58 — Installing Clip Angle
- 3:19 — Tightening Rail Post Bracket
- 3:33 — Project Credits